Elgin gas leak: weekly summary (April 20-26)

April, 26, 2012 - Further significant steps have been taken this week towards stopping the Elgin gas leak, including the installation of a key piece of equipment on the G4 well to divert leaking gas away from the wellhead platform. Known as a diverter, this specially manufactured device has been connected to the G4 wellhead and is now carrying the flow of leaking gas, via four flexible hoses, away from the wellhead and the platform. The fitting of this device ensures that there is no gas accumulating around the G4 wellhead or the platform. This reinforces the safety of the well intervention operation and helps alleviate restrictions on helicopter landings on the platform from now on.

Due to the unfavourable weather conditions, a team of experts from Total and specialist contractors were able to make only two further flights to the Elgin platform this week. During these visits, in addition to installing the diverter, they were able to continue laying down essential equipment for the well intervention and undertook further monitoring and inspection.

The state-of-the-art, dynamically positioned drilling rig, the West Phoenix, will be used as the main support vessel for the well intervention operation and is preparing for the operation while located on the edge of the 2 nautical mile Elgin exclusion zone. The Skandi Aker, currently still in Peterhead harbour in Scotland, will have a complementary supporting role during this operation.

Next steps will be the manoeuvring of the West Phoenix alongside Elgin complex to be in a position to start the well intervention operation as soon as possible.

In parallel, drilling of the first relief well by the Sedco 714, 2 km east of the Elgin complex, is progressing according to plan.

 

FAQ

 

11 Mar 13 08:30 United Kingdom: Total resumes production from the Elgin/Franklin area in the UK North Sea  
03 Aug 12 15:00 Elgin progress update - August 2012  
21 May 12 08:30 Elgin - Total confirms the success of the G4 well intervention  
16 May 12 11:15 Elgin leak stopped after well intervention  
15 May 12 10:30 Start of the well intervention operation to stop the Elgin leak  
10 May 12 18:10 Elgin gas leak : Weekly Update (May 4 - 10)  
04 May 12 17:40 Elgin gas leak: Weekly Summary (April 27 – May 4)  
26 Apr 12 16:05 Elgin gas leak: weekly summary (April 20-26)  
20 Apr 12 15:40 Elgin Weekly Progress Update (April 13 – 20)  
13 Apr 12 20:40 Elgin gas leak : Weekly Progress Update (6-13 April 2012)  
06 Apr 12 15:15 Elgin Platform visit confirms well intervention plans can proceed  
05 Apr 12 18:45 Next Steps To Stop The Leak Underway: Elgin Platform Safely Reboarded  
05 Apr 12 10:35 Elgin incident update  
02 Apr 12 18:30 Conference call update on Elgin incident  
02 Apr 12 13:00 Elgin gas leak: Total prepares operations to stop the leak  
31 Mar 12 12:20 Extinguishing of the flare on the Elgin platform  
30 Mar 12 18:30 Status on UK – Gas leak incident at Elgin platform in the North Sea  
30 Mar 12 13:30 Elgin incident update following press conference  
29 Mar 12 19:00 Status on UK – Gas leak incident at Elgin platform in the North Sea  
28 Mar 12 18:25 Elgin update 4 - Total E&P UK Ltd  
28 Mar 12 16:00 Elgin update 3 - Total E&P UK Ltd  
27 Mar 12 16:55 Status on UK – Gas leak incident at Elgin platform in the North Sea  
26 Mar 12 21:00 Elgin update 2 - Total E&P UK Ltd  
26 Mar 12 14:25 Elgin update 1 - Total E&P UK Ltd  
26 Mar 12 04:00 News Release 5 - Total E&P UK Ltd  
25 Mar 12 23:00 Press statement 4 - 25 March 2012 - Total E&P UK Ltd  
25 Mar 12 18:45 Press Statement 3 - 25 March 2012 - Total E&P UK Ltd  
25 Mar 12 16:45 Press Statement 2 - 25 March 2012 - Total E&P UK Ltd  
25 Mar 12 14:00 Press Statement 1 - 25 March 2012 - Total E&P UK Ltd  
25 Mar 12 13:45 Holding Statement 25 March 2012 - Total E&P UK Ltd  
By continuing browsing this website, you accept the use of cookies or other tracers for statistics of visits to optimize the functionality of the site. For more information and for tracers settings