Elgin gas leak : Weekly Progress Update (6-13 April 2012)

April 13, 2012, 20h40 (Paris time) - Total has made significant progress in the past week towards stopping the gas leak on well G4 on its Elgin platform. This included preparatory work for its planned well control operation and the drilling of both a primary and a back-up relief well.

Following an initial reconnaissance mission on April 5th, involving experts from Total and specialist contractors Wild Well Control (WWC), two further flights to the Elgin platform were made this week on April 10th and 12th.

During these two visits additional valuable information was gathered to prepare for the well control operation and to carry out essential cleaning of key areas around the wellhead, where waxy deposits had accumulated.

Several further helicopter flights may be required ahead of the positioning of a well intervention support vessel alongside the Elgin complex. Two separate vessels are being mobilised. The West Phoenix, an ultra modern semi-submersible drilling rig, arrived on April 11th and is on standby just outside the two nautical mile Elgin exclusion zone. The light intervention vessel the Skandi Aker, is currently in Peterhead harbour in North East Scotland being fitted with dedicated equipment to support the operations. Both vessels are suitable for the well control operation.

On April 7th, a supply plane brought specialist equipment for the well control operation, from Houston to Scotland.

Two rigs are being mobilised for the drilling of the relief wells. The Sedco 714, which is expected to start drilling first, arrived at a standby location outside the Elgin exclusion zone on April 8th, where it is awaiting completion of site surveys for the final anchor positions. The second rig, the Rowan Gorilla V is currently suspending operations on the nearby West Franklin field before repositioning itself to drill the second relief well.

All operations to stop the leak are progressing according to plan.

Further updates will be issued on a regular basis.

 

See FAQ

 

Contacts

Isabelle DESMET - +33 (0)1 47 44 37 76
Charles-Etienne LEBATARD - +33 (0)1 47 44 45 91
Victoria CHANIAL - +33 (0)1 47 44 35 86
Aude COLAS DES FRANCS - +33 (0)1 47 44 47 05
Michaël CROCHET-VOUREY - +33 (0)1 47 44 81 33
Sandra DANTE - +33 (0)1 47 44 46 07
Christine de CHAMPEAUX - +33 (0)1 47 44 47 49
Hortense OURY - +33 (0)1 47 44 23 34
Florent SEGURA - +33 (0)1 47 44 31 38
Frédéric TEXIER - +33 (0)1 47 44 38 16
Anastasia ZHIVULINA - +33 (0)1 47 44 76 29

11 Mar 13 08:30 United Kingdom: Total resumes production from the Elgin/Franklin area in the UK North Sea  
03 Aug 12 15:00 Elgin progress update - August 2012  
21 May 12 08:30 Elgin - Total confirms the success of the G4 well intervention  
16 May 12 11:15 Elgin leak stopped after well intervention  
15 May 12 10:30 Start of the well intervention operation to stop the Elgin leak  
10 May 12 18:10 Elgin gas leak : Weekly Update (May 4 - 10)  
04 May 12 17:40 Elgin gas leak: Weekly Summary (April 27 – May 4)  
26 Apr 12 16:05 Elgin gas leak: weekly summary (April 20-26)  
20 Apr 12 15:40 Elgin Weekly Progress Update (April 13 – 20)  
13 Apr 12 20:40 Elgin gas leak : Weekly Progress Update (6-13 April 2012)  
06 Apr 12 15:15 Elgin Platform visit confirms well intervention plans can proceed  
05 Apr 12 18:45 Next Steps To Stop The Leak Underway: Elgin Platform Safely Reboarded  
05 Apr 12 10:35 Elgin incident update  
02 Apr 12 18:30 Conference call update on Elgin incident  
02 Apr 12 13:00 Elgin gas leak: Total prepares operations to stop the leak  
31 Mar 12 12:20 Extinguishing of the flare on the Elgin platform  
30 Mar 12 18:30 Status on UK – Gas leak incident at Elgin platform in the North Sea  
30 Mar 12 13:30 Elgin incident update following press conference  
29 Mar 12 19:00 Status on UK – Gas leak incident at Elgin platform in the North Sea  
28 Mar 12 18:25 Elgin update 4 - Total E&P UK Ltd  
28 Mar 12 16:00 Elgin update 3 - Total E&P UK Ltd  
27 Mar 12 16:55 Status on UK – Gas leak incident at Elgin platform in the North Sea  
26 Mar 12 21:00 Elgin update 2 - Total E&P UK Ltd  
26 Mar 12 14:25 Elgin update 1 - Total E&P UK Ltd  
26 Mar 12 04:00 News Release 5 - Total E&P UK Ltd  
25 Mar 12 23:00 Press statement 4 - 25 March 2012 - Total E&P UK Ltd  
25 Mar 12 18:45 Press Statement 3 - 25 March 2012 - Total E&P UK Ltd  
25 Mar 12 16:45 Press Statement 2 - 25 March 2012 - Total E&P UK Ltd  
25 Mar 12 14:00 Press Statement 1 - 25 March 2012 - Total E&P UK Ltd  
25 Mar 12 13:45 Holding Statement 25 March 2012 - Total E&P UK Ltd